Hall in Tyrol, austria
category: health care
services: structure planning, static, foundation
client: A.Ö. Bezirkskrankenhaus Hall i. Tirol
Architect: Büro Hinterwirth ZT (Gmunden)
costs: 80 Mio €
comissioning: 2015
Technical description
New construction of a three-storied surgical ward at the hospital in Hall, the so called “Haus 14”
New construction of a treatment wing for approximately 200 beds (distributed in six different wards and one intensive and recovery area)
- Six operating theatres and one maternity ward
- Partly roofed yard with access for cars and turning area
- Underground car park with approximately 162 parking spaces
- Accessibility to the house 10 via a connecting bridge over the street: lightweight construction (steel and glass construction)
- Roof area with solar power plants respectively a photovoltaic systems
Map
Please zoom out [–] to see some more projects.